ORGANIZATION NAME | PROJECT | MITIGATION ACTION# | MITIGATION ACTION | PROJECT DESCRIPTION | REQUESTED FUNDS |
Action Environmental | AE Truck 1 Replacement | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 3 diesel refuse trucks | $174,000 |
Borough of Oceanport | Oceanport DPW Vehicle Sustainability Initiative | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 2 International Dump Trucks and 1 International Garbage Truck with new diesel | $328,630 |
Borough of Park Ridge #1 | Low Emission Garbage Truck | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace a 2001 garbage truck with a new lower emission garbage truck | $210,000 |
Borough of Wharton #1 | Wharton Green Future/Trucks | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 4 diesel trucks with new diesel trucks | $750,000 |
City of Elizabeth | Reducing Emissions through Replacement of Class 8 Trucks | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replacement of 5 diesel vehicles | $700,000 |
City of Newark & CCMT | Newark Battery Electric Garbage Truck Project | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 5 1990 diesel garbage trucks with battery electric trucks | $2,046,000 |
Hudson County Motors | Hudson County Motors 100 Drayage Truck Program | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 100 drayage trucks with all electric | $27,500,000 |
IKEA Distribution Services North America #1 | Electrification of Distribution Terminal Tractors | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 4 electric terminal tractors and charging stations | $960,000 |
International Motor Freight and IKEA Transport North America | Electric Dray Truck for Use in Port Newark | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 1 Dray Truck with electric to be stationed at Port Newark | $262,500 |
New Jersey Natural Gas 1 | Blue Diamond Cement Trucks | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 20 new Class 8 low NOx CNG cement trucks | $1,000,000 |
New Jersey Natural Gas 2 | Tri State Refuse Haulers | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 10 new Class 8 low NOx CNG refuse hauler | $500,000 |
New Jersey Natural Gas 3 | Wood Haven Lumber Millwork Trucks | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 12 new Class 8 low NOx CNG millwork delivery trucks | $600,000 |
New Jersey Natural Gas 4 | Ritchie & Page | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 12 new Class 8 low NOx CNG millwork delivery trucks | $500,000 |
Port Authority of NY/NJ | Electric drayage truck replacement | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 20 diesel trucks with electric. 75percent of the cost of replacement truck | $6,000,000 |
Railroad Construction Company, Inc | Thor Tractor | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace a diesel tractor with an electric tractor | $300,000 |
Regional Industries LLC | Regional Industries Battery Electric Garbage Truck | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 5 Battery Electric Garbage Trucks in Elizabeth, NJ | $1,650,000 |
Rutgers University | RU Facilities Truck and Bus Replacement | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 15 vehicles with new more efficient vehicles. | $625,000 |
South Jersey Industries/South Jersey Gas #1 | Gold Medal Refuse Haulers | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 36 new Class 8 low NOx CNG municipal refuse haulers utilizing landfill renewable natural gas as fuel | $1,800,000 |
South Jersey Industries/South Jersey Gas #2 | Action Supply Cement Trucks | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 25 new Class 8 low NOx CNG cement trucks utilizing landfill renewable natural gas as fuel | $1,250,000 |
South Jersey Industries/South Jersey Gas #3 | Short Haul Tractors | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 72 new Class 8 low NOx CNG short haul tractors utilizing landfill renewable natural gas as fuel | $3,600,000 |
South Jersey Industries/South Jersey Gas #4 | CCIA Refuse Haulers | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | 20 new Class 8 low NOx CNG refuse haulers utilizing landfill renewable natural gas as fuel | $1,000,000 |
Republic Services of New Jersey | Republic Services of New Jersey | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 19 refuse trucks with lower and near zero emission vehicles | $437,000 |
Suburban Disposal | Suburban Disposal Clean Truck Program | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace a total of 45 diesel disposal trucks with CNG, 15 trucks per year over a 3 year period | $25,000,000 |
Sysco Metro New York, LLC | Sysco Diesel Truck Emission Reduction | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replacement of 15 diesel trucks | $5,912,951 |
Township of Wall | Dump Truck replacement | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace a 1996 dump truck | $130,000 |
Waste Management | WM Natural Gas Fleet Project | 1 | Class 8 Local Freight Trucks & Port Drayage Trucks | Replace 137 NG trucks over 10 years | $10,200,000 |
Academy Express | Academy clean air bus replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 6 older model buses with new clean diesel technology vehicles | $862,500 |
Caldwell- West Caldwell Public Schools #1 | Propane School Bus Pilot | 2 | Class 4-8 School Bus, or Transit Bus | Replace 3 diesel school buses with propane buses | $63,750 |
Caldwell- West Caldwell Public Schools #3 | Electric School Bus Pilot Project | 2 | Class 4-8 School Bus, or Transit Bus | 1 electric bus and 1 charging station in Caldwell | $300,000 |
City of Hoboken EV Charging 2 | Hoboken Electric Shuttle bus & Charging Station Project | 2 | Class 4-8 School Bus, or Transit Bus | Replacing the Hop Shuttle Bus fleet with all-electric powertrain systems | $1,232,600 |
Coach USA, Inc. | Coach USA - Reducing 114,257 lbs of Nox | 2 | Class 4-8 School Bus, or Transit Bus | Replace 11 buses between 2019 and 2022 | $1,400,000 |
County of Hudson 1 | Hudson County Electric Vehicle Purchasing Plan | 2 | Class 4-8 School Bus, or Transit Bus,Replacement of 48 diesel & gas vehicles (46 transit | 2 utility) with electric vehicles | $14,400,000 |
County of Somerset | Community Transportation Alternative Fuel Program | 2 | Class 4-8 School Bus, or Transit Bus | Replace a 2003 heavy duty diesel transit style bus with an Electric Bus and charging system | $750,000 |
Durham School Services | LP,Durham School Bus Replacement Project | 2 | Class 4-8 School Bus, or Transit Bus | Replacement of 55 diesel school buses | $983,428 |
First Student, inc | New Jersey VW School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 143 diesel buses with new cleaner diesel | $5,912,951 |
H.A. DeHart & Sons, inc | Electric School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 50 school buses with electric buses | $15,000,000 |
H.A. DeHart & Sons, inc | Diesel School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 150 diesel school buses | $4,987,500 |
Hoover Elizabeth | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 15 buses in phases with lowest Nox propane buses. | $867,765 |
Hoover Jersey City | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 12 buses in phases with lowest Nox propane buses. | $654,384 |
Hoover Leonia | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 12 buses in phases with lowest Nox propane buses. | $658,341 |
Hoover Lyndhurst | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 4 buses in phases with lowest Nox propane buses. | $223,378 |
Hoover Newton | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 1 bus in phases with lowest Nox propane buses. | $55,201 |
Hoover Plainfield | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 8 buses in phases with lowest Nox propane buses. | $444,408 |
Hoover Randolph | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 15 buses in phases with lowest Nox propane buses. | $583,090 |
Hoover Readington | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 14 buses in phases with lowest Nox propane buses. | $777,453 |
Hoover Rockaway | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 4 buses in phases with lowest Nox propane buses. | $222,752 |
Hoover Roxbury | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 10 buses in phases with lowest Nox propane buses. | $531,648 |
Hoover Washington Twp | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 8 buses in phases with lowest Nox propane buses. | $433,630 |
New Jersey City University #2 | NJCU EV SHUTTLE BUS and EV CHARGER | 2 | Class 4-8 School Bus, or Transit Bus | Electric Shuttle bus, battery and charging station | $248,000 |
New Jersey City University #3 | NJCU EV Shuttle Bus & infrastructure | 2 | Class 4-8 School Bus, or Transit Bus | Electric Shuttle bus, battery and charging station | $248,000 |
NJ Transit - Camden | Electric buses and charging infrastructure | 2 | Class 4-8 School Bus, or Transit Bus | Replace 8 CNG transit buses with electric buses and install charging infrastructure | $8,100,000 |
Proterra | Sustainable Mobility for New Jersey | 2 | Class 4-8 School Bus, or Transit Bus | The Public Transit Electrification Project: Replace diesel buses with 30 zero-emission, battery-electric transit buses and 30 multi-use depot charging stations at one or more municipalities to provide electric mobility for all NJ residents | $24,100,100 |
South Jersey Industries/South Jersey Gas #5 | Atlantic County Government Transit Bus | 2 | Class 4-8 School Bus, or Transit Bus | 54 new low NOx CNG transit buses utilizing landfill renewable natural gas to fuel the vehicles | $1,890,000 |
Student Transportation of America, Inc. #1 | School Bus Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Electrify 5 school buses | $1,675,000 |
Township of Middletown #2 | Middletown Low-Emission Vehicle Replacement | 2 | Class 4-8 School Bus, or Transit Bus | Replace 3 diesel Jitney Buses with CNG buses | $285,000 |
Township of West Orange | West Orange Zero Emissions Shuttle Bus Acquisition | 2 | Class 4-8 School Bus, or Transit Bus | Replace 2 diesel shuttle buses with 2 Zero Emission Shuttle Buses | $800,000 |
KEW Grant Services LLC | Nordco All-Electric Shuttlewagon freight switcher | 3 | Freight Switchers | Electric freight switcher projects throughout NJ | $1,575,000 |
Delaware River & Bay Authority | Repowering of 2 ferry vessels | 4 | Ferries/Tugs | Repowering of 2 ferry vessels | $5,800,000 |
Hydrogen House Project 1 | Duffy 18 Passenger Ferry Upgrade/Retrofit | 4 | Ferries/Tugs | Upgrade a 1 passenger ferry with the latest hydrogen fuel cell, battery, ultra-capacitor, and solar technology | $615,000 |
New York Water Taxi | New York Water Taxi Repower | 4 | Ferries/Tugs | Repower 3 vessels with tier 3 engines | $330,000 |
Port Authority of NY/NJ | Ferry Repower | 4 | Ferries/Tugs | Provide financial assistance to ferry operator to replace six Tier 1 Ferry boat engines with Tier 3. | $1,000,000 |
SeaStreak, LLC | SeaStreak Ferry Diesel Emission Mitigation Project | 4 | Ferries/Tugs | Repower a Tier 1 ferry vessel to Tier 3 | $1,687,600 |
Statue Cruises, LLC #1 | Miss Liberty | 4 | Ferries/Tugs | Repower a 1954 ferry vessel with Tier 3 engines | $325,000 |
Statue Cruises, LLC #2 | Statue of Liberty V | 4 | Ferries/Tugs | Repower a 1977 ferry vessel with Tier 3 engines | $445,000 |
Weeks Marine #1 | Repower of 574 | 4 | Ferries/Tugs | Replace a mechanical generator with a Tier 3 marine generator | $150,000 |
Port Authority of NY/NJ | Cruise Vessel Shorepower | 5 | Ocean Going Vessels Shorepower | This project will install the landside electrical infrastructure necessary for cruise vessels calling. | $15,000,000 |
Borough of Haddonfield | Borough of Haddonfield CNG Vehicle Conversion and infrastructure | 6 | Class 4-7 Local Freight Trucks | Replace 14 diesel trucks with CNG and infrastructure | $3,303,000 |
Borough of Park Ridge 2 | Park Ridge Electric Meter Reader Project | 6 | Class 4-7 Local Freight Trucks | Replace a hybrid meter reader vehicle with an all electric vehicle | $35,000 |
Caldwell- West Caldwell Public Schools #2 | Electric Truck Pilot Project | 6 | Class 4-7 Local Freight Trucks | Replace 2 diesel trucks with 1 electric truck and 1 charger in Caldwell | $30,000 |
City of Jersey City & CCMT | Jersey City Battery Electric Garbage Truck Project | 6 | Class 4-7 Local Freight Trucks | Replace 5 diesel garbage trucks with EV garbage trucks in 2 phases | $2,046,000 |
IKEA Distribution Services North America #2 | Electrification of Last Mile Home Delivery Trucks | 6 | Class 4-7 Local Freight Trucks | 5 electric box trucks and charging stations | $825,000 |
New Jersey City University #1 | NJCU EV BOX TRUCK and EV CHARGER | 6 | Class 4-7 Local Freight Trucks | Electric Box Truck, battery and charging station | $248,000 |
NJ DOC and NJ Treasury | Replace state owned diesel trucks | 6 | Class 4-7 Local Freight Trucks | Replace approx 35 old state owned diesel trucks with new diesel trucks over 3 year period. | $5,000,000 |
NJDEP | Replace urban diesel solid waste vehicles | 6 | Class 4-7 Local Freight Trucks | Replace approx 70 solid waste vehicles. These trucks were exempt from the retrofit requirements under the Diesel Retrofit Law. | $15,000,000 |
NJDOT | Replacement of NJDOT diesel trucks | 6 | Class 4-7 Local Freight Trucks | Replace 51 model year 2001-2001 trucks that are owned and operated by NJDOT. Assumed 10 year remaining useful life. | $7,325,000 |
Township of Middletown #1 | Middletown Low-Emission Vehicle Replacement | 6 | Class 4-7 Local Freight Trucks | Replacement of the 6 diesel refuse vehicles to CNG vehicles: | $1,655,000 |
Township of Middletown #3 | Middletown Low-Emission Vehicle Replacement | 6 | Class 4-7 Local Freight Trucks | The replacement of four refuse packer trucks and three refuse dump trucks with CNG vehicles | $1,945,000 |
Elizabethtown Gas 1 | Elizabethtown Gas | 7 | Airport Ground Support Equipment | 50 CNG Terminal Tractors | $2,500,000 |
Elizabethtown Gas 2 | Elizabethtown Gas | 7 | Airport Ground Support Equipment | 73 GSE CNG replacements (aircraft refuelers) | $3,650,000 |
Hydrogen House Project 4 | Newark Liberty Airport Ground Support Vehicle | 7 | Airport Ground Support Equipment | 22 Hydrogen powered transport vehicles – airport ground support | $695,000 |
Port Authority of NY/NJ | Aviation GSE | 7 | Airport Ground Support Equipment | Purchase and install 23 Port-owned charging stations to support the conversion of 53 GSE to electric at Newark airport. | $1,750,000 |
Port Authority of NY/NJ | Aviation GSE | 7 | Airport Ground Support Equipment | Provide up to 75percent reimbursement for tenants to purchase 36 charging stations to support the conversion of 71 GSE to electric at Newark. | $7,500,000 |
Best Transportation | Best Transportation Electric Port Fleet Project | 8 | Forklifts and Port Cargo Handling Equipment | 4 electric yard tractors and 1 electric drayage truck | $1,295,200 |
County of Burlington | Burlington County NOx Reduction Project | 8 | Forklifts and Port Cargo Handling Equipment | 4 engines. Project proposes the elimination of the entire fleet of propane-fueled forklifts currently in use by Burlington County departments and proposes to replace them with electric models. In addition, 6 charging stations will be installed at 3 locations within Burlington County | $170,601 |
Gloucester Terminals LLC #1 | Gloucester Terminal Electric Ship-to-Shore Crane | 8 | Forklifts and Port Cargo Handling Equipment | Replace 2 existing ship-to-shore diesel-powered cranes (and will limit needed use of an additional diesel-powered Liebherr mobile-harbor crane) with 1 electric ship-to-shore crane | $9,375,000 |
Gloucester Terminals LLC #1A | Gloucester Terminal Electric Ship-to-Shore Crane | 8 | Forklifts and Port Cargo Handling Equipment | Purchase 1 new electric crane and to refurbish and electrify 1 existing crane | $9,375,000 |
Maher Terminals LLC | Straddle Fleet Rehabilitation | 8 | Forklifts and Port Cargo Handling Equipment | Replace 10 Tier 1 diesel straddle carriers with 5 Tier 5 hybrid straddle carriers | $739,588 |
Nuvera Fuel Cells, LLC | Fuel Cell Electric Top Loader Ports | 8 | Forklifts and Port Cargo Handling Equipment | 5 Fuel cell container handlers at the Port of NY/NJ powered by renewable hydrogen | $7,976,250 |
Port Authority of NY/NJ | Electric Cargo Handling Equipment | 8 | Forklifts and Port Cargo Handling Equipment | Replace 50 tenant owned cargo handling equipment at a Port Authority facility in New Jersey with electric yard tractors (up to 75percent reimbursement) and associated charging infrastructure. | $15,000,000 |
Red Hook Terminals LLC & CCMT | Red Hook Pt Newark Battery Electric Yard Tractors | 8 | Forklifts and Port Cargo Handling Equipment | Replace 6 of the oldest and highest emitting diesel tractors with all-electric, zero emissions units | $2,400,000 |
South Jersey Port Corporation | Crane Electrification | 8 | Forklifts and Port Cargo Handling Equipment | Replace a 50 yr old diesel crane with an electric crane | $10,000,000 |
Borough of Bound Brook | Bound Brook Commuter Parking Lot Charging Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 Electric Vehicle Charging Stations at commuter parking lot | $15,000 |
Borough of Edgewater | River Road Electric Vehicle Infrastructure Project | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Installation of 4 dual Electric Vehicle Charging Stations within the Borough of Edgewater | $32,000 |
Borough of Glen Rock | Glen Rock Municipal EV Charging Station Initiative | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 Electric Vehicle Charging Stations in Glen Rock | $41,000 |
Borough of Haddon Heights 1 | Haddon Heights Level 2 Fast-Charging EV Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Location: 1st priority along the railroad corridor, easily accessible from I-295, US 30, NJ 168 and our local downtown business community. | $7,920 |
Borough of Haddon Heights 2 | Haddon Heights Level 2 Fast-Charging EV Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Location: 2nd priority location at our DPW Service Operations Facility, easily accessible from I-295, US 30, NJ 168, our local downtown business community and the adjacent ballfields. | $7,920 |
Borough of Longport | Electric Vehicle Charging Stations Installation in Longport | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 1 dual head level 2 Electric Vehicle Charging Stations located at the Borough Hall | $40,000 |
Borough of Oradell | Oradell EV Charging Station Initiative | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 Electric Vehicle Charging Stations in 2 separate commuter lots in Oradell | $15,000 |
Borough of Paramus | Paramus Electric Charging Station Initiative | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 5 Charging stations installed at the Municipal Complex in Paramus | $16,000 |
Borough of Wharton #2 | Wharton Electric Vehicle Charging Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 4 Electric vehicle charging stations in public parking lots | $20,000 |
Businovation, LLC | Municipal Microgrid Ultrafast EV Charging Cluster | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 5 Fast electric vehicle charging | $4,000,000 |
ChargePoint, Inc. #1 | Level 2 Charging Station Deployment Program | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install 1000 level 2 chargers. Locations TBD | $6,000,000 |
ChargePoint, Inc. #2 | Medium & Heavy Duty Charging Infrastructure | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install 200 chargers for medium & heavy duty class 3-8 vehicles. Locations TBD | $20,000,000 |
ChargePoint, Inc. #3 | DC Fast Charging Corridor Grant Program | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install 40 DCFCs and at least 20 level 2 chargers. Locations TBD | $4,000,000 |
ChargePoint, inc | Bordentown DC fast charging hub | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 4 fast chargers at Love’s Travel Stop in Bordentown | $400,183 |
ChargePoint, inc | Newark DC Fast charging hubs | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 4 fast chargers in Newark | $2,382,703 |
ChargePoint, inc | Camden DC fast charging hubs | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 4 fast chargers in Camden | $1,191,352 |
City of Atlantic City | Electric Vehicle Charging Stations Installation in Atlantic City | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install 2 dual head Electric Vehicle Charging Stations at City Hall and Gardners Basin | $40,000 |
City of Brigantine | EVCS Installation in Downtown Brigantine | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install 2 dual head level 2 Electric Vehicle Charging Stations at the City Library and City Community Center | $80,000 |
City of Burlington | Electric Vehicle Charging Stations Installation in Downtown Burlington | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 dual head level 2 Electric Vehicle Charging Stations | $20,000 |
City of Cape May | Electric Vehicle Charging Stations Installation in Cape May City | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 dual head level 2 Electric Vehicle Charging Stations | $60,000 |
City of East Orange | East Orange Vehicle Charging Initiative | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 Electric Vehicle Charging Stations | $35,000 |
City of Hoboken EV Charging | Hoboken Electric Vehicle Charging Station Project | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 14 charging stations at public parking garages and along commercial corridors in Hoboken | $99,000 |
City of Margate | Electric Vehicle Charging Stations Installation in Margate City | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 dual head Electric Vehicle Charging Stations located at City Hall and the Community Center | $80,000 |
City of Passaic | EV Charging Stations through Passaic City | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 11 Electric Vehicle Charging Stations | $88,000 |
City of Pleasantville | EVCS Installation in Pleasantville, NJ | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install a dual head Level 2 electric vehicle charging station adjacent to municipal buildings | $40,000 |
City of Somers Point | Electric Vehicle Charging Stations Installation in Somers Point | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 5 dual head level 2 Electric Vehicle Charging Stations | $100,000 |
County of Burlington | Burlington County NOx Reduction Project | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 6 Charging Stations | $22,961 |
County of Essex | Electric Vehicle Charging Station Expansion | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install 5 dual port electric charging stations | $125,000 |
County of Hudson 2 | Hudson County Electric Vehicle Infrastructure Plan | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Installation of 10 Electric vehicle charging stations | $80,000 |
Envoy Technologies Inc. | Accelerating MUD Car Sharing in NJ Zero Emission Vehicle Ecosystem | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Deploy 100 chargers within NJ’s MUD sector. | $3,064,366 |
EV Connect, Inc. | EV Connect Community-based Charging Program | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Installing 1,000 Electric Vehicle Charging Stations throughout the state over the next 3 years | $7,000,000 |
EVgo | Statewide EV Charging Network | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Provide 24 fast chargers across 6 sites. | $1,200,000 |
Fort Lee Parking Authority | Fort Lee Electric Vehicle Infrastructure Project | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install five (5) dual electric vehicle charging stations in or near planned parking deck | $40,000 |
Greenspot | Greenspot EVSE | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 831 electric parking spots (DCFC and level 2) with 80percent of the spots used for car sharing. Locations TBD | $10,830,000 |
Hydrogen House Solar | Portable Solar Hydrogen Refueling Station | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Hydrogen fueling station using renewable energy source on Rutgers New Brunswick campus | $1,270,000 |
Hydrogen House Residential Hydrogen | Residential Hydrogen Refueling Station | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Hydrogen fueling station located at Hydrogen House project (Hopewell, NJ) with portable refueling trailer | $640,000 |
Hydrogen House Project 1.1 | Residential Hydrogen Refueling Station | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Hydrogen fueling station located at Hydrogen House project (Hopewell, NJ) with portable storage trailer | $695,000 |
NCSI | Hydrogen Production Facility - NJ | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Provides New Jersey with Hydrogen Production Facilities | $10,000,000 |
NJ Transit | Charging stations at NJ Transit Rail & Bus Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 53 charging stations at 8 rail station and bus garages | $95,000 |
Raritan Borough Environmental Commission | Electric Vehicle Charging Station | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Installation of 2 Level 2 electric vehicle charging stations | $25,000 |
Roselle Board of Education | Roselle BOE High School Charging Station | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 1 Electric Vehicle Charging Stations | $8,000 |
Rutgers University | Rutgers University-wide charging station | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Installation of 100 Electric Vehicle Charging Stations throughout the RU campuses | $1,000,000 |
South Jersey Transportation Authority (SJTA) | AC Expressway EV Charging Station Project | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 6 DC fast charging stations | $450,000 |
The City of Egg Harbor | Egg Harbor City Hub EV Station | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Install 2 dual charging kiosks for a total of 4 charging connections | $33,000 |
The Township of Springfield | Springfield Electric Vehicle Charging Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 8 Electric Vehicle Charging Stations in town of Springfield | $76,800 |
The Village of Ridgewood | Ridgewood Municipal Charging Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 Electric Vehicle Charging Stations in the parking lot of Village Hall | $20,000 |
Town of Dover | Dover Parking Garage EV Charging Station Project | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 4 Electric Vehicle Charging Stations in parking garage | $32,000 |
Township of Bloomfield | Bloomfield Municipal EV Charging Station Project | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 10 Electric Vehicle Charging Stations throughout township | $80,000 |
Township of Little Falls | Greenway EV Charging Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 Electric Vehicle Charging Stations | $15,000 |
Township of Moorestown #1 | Second Street Parking Lot EV Charging Station (Moorestown) | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Single unit Electric Vehicle Charging Stations at township owned lot on 2nd St | $47,640 |
Township of Moorestown #2 | Town Hall Parking Lot EV Charging Station | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Single unit Electric Vehicle Charging Stations at town hall | $47,640 |
Township of Teaneck | Teaneck Road EV Charging Stations | 9 | Light Duty Zero Emission Vehicle Supply Equipment | 2 Electric Vehicle Charging Stations in town hall parking lot | $26,400 |
V2G Energy, LLC #1 | Assigned Charging for Electric Vehicles | 9 | Light Duty Zero Emission Vehicle Supply Equipment | Installation of 1,000 Electric Vehicle Charging Stations for Workplace Charging Fleet Operations Multi-family residential. Locations TBD | $2,400,000 |
Port Authority of NY/NJ | Truck replacement program | 10 | DERA Option | 50percent of the cost of 1500 replacement drayage truck powered by a 2011 model year or newer certified engine. Not to exceed $25,000 per truck. Scalable. | $37,500,000 |
Port Authority of NY/NJ | Capture Control System | 10 | DERA Option | Purchase one METS on-shore mobile system for use at Port Newark Public Berth | $3,700,000 |
Dean Transportation, Inc | Dean Transportation, Inc. Replacement Project | 1,6 | Multiple | Replacement of 8 vehicles | $155,442 |
Municipality of Princeton | Green the Princeton Municipal Fleet | 1,2,6 | Multiple,2 EV shuttle buses | 4 Class 4&5 EV Flatbed trucks, 4 EV Garbage trucks, charging equipment | $2,905,500 |
Calstart | NJ Clean Vehicle Voucher Incentive Program | 1,2,6,7,8 | | 50percent cost share by participants in voucher program | $35,000,000 |
Avalon Transportation, LLC | Avalon Transportation | 2,10 | Multiple | Replace 28 diesel buses | $3,675,000 |
United Airlines | Airport GSE Replacement | 7,8 | Airport Ground Support Equipment | Replace 78 pieces of airport GSE with all electric options | $5,133,058 |
Cameron Dynamics LLC dba WorldKlass Technologies | Infrared Fuel Excitation System for NJT Buses | NOT ELIGIBLE | | Grant funding to support a combined field test and lab test to quantify Infrared Fuel Excitation System | $48,150 |
TreadStone Technologies, Inc. | Technology Innovation, Demonstration and Manufacturing: Enhancing the Performance and Lowering the Cost of New Transportation Technologies | NOT ELIGIBLE | | Support technology enhancements, demonstration and in-State manufacturing, thereby creating a local supply chain and new jobs for the State of New Jersey. | $3,900,000 |