8 Hour Ozone SIP

“The New Jersey Department of Environmental Protection finalized its revision to the State Implementation Plan (SIP) to implement the 8-Hour Ozone National Ambient Air Quality Standard (NAAQS). The core of this SIP revision is the State’s demonstration that its two multi-state 8-hour ozone nonattainment areas will attain the 8-hour ozone NAAQS by their mandatory attainment date of June 15, 2010. The remainder of the SIP revision addresses the other mandatory SIP elements for 8-hour ozone (with the exception of a Reasonable Available Control Technology (RACT) analysis, which the Department of proposed on February 2, 2007 and will submit as final to the USEPA separately) and other related issues.”

Both of the proposed and final SIP documents are posted on this webpage.

Any documents that were revised for the final SIP revision are listed after the documents that were submitted as part of the proposal.

Appendix A: The Nature of the Ozone Air Quality Problem in the Ozone Transport Region: A Conceptual Description

Proposed Appendix B: Air Quality Trends

Final Appendix B: Air Quality Trends

Appendix C1: Memorandum of Understanding Among the States of the Ozone Transport Commission Concerning the Incorporation of High Electrical Demand Day Emission Reduction Strategies into Ozone Attainment State Implementation Planning

Appendix C2: Identification and Evaluation of Candidate Control Measures, Final Technical Support Document

Appendix C3: Resolution 06-02 of the Ozone Transport Commission Concerning Coordination and Implementation of Regional Ozone Control Strategies for Various Sources

Appendix C3 Attachment 1

Zip file: C3

Appendix C4: Assessment of Control Technology Options for Petroleum Refineries in the Mid-Atlantic Region

Appendix D1: TSD-li: A Modeling Protocol for the OTC SIP Quality Modeling System for Assessment of the Ozone National Ambient Air Quality Standard in the Ozone Transport Region

Appendix D2-1: USEPA Modeling Guidance (2005)

Appendix D2-2: USEPA Modeling Guidance (2007)

Appendix D3: CMAQ Modeling Documentation

Appendix D3-1: TSD-1d: 8hr Ozone Modeling using the SMOKE/CMAQ System

Appendix D3-2: OTC CMAQ Air Quality Model Configuration

Appendix D3-3: Modeling Domain Boundary

Appendix D3-4: Horizontal Grid Definition of MM5 and CMAQ Modeling Domain

Appendix D3-5: Vertical Layer Definitions for MM5 and CMAQ Modeling Domain

Appendix D3-6: Report on the Set-up and Application of the 36km CMAQ Model and the Extraction of the Boundary Conditions

Appendix D4: Metrological Modeling and Supplemental Analyses

Appendix D4-1: TSD-1a: Metrological Modeling using Penn State/NCAR 5th Generation Mesoscale Model (MM5)

Appendix D4-2: Analysis of MM5 Simulations based on three PBL schemes over the eastern US for August 6 to 16, 2002

Appendix D4-3: Numerical Experimental Analysis Data for the Year of 2002

Appendix D4-4: MM5 Model Configuration

Appendix D4-5: Horizontal Grid Definition for MM5 and CMAQ Modeling Domain

Appendix D4-6: Vertical Layer Definitions for MM5 and CMAQ Modeling Domain

Appendix D4-7: Determination of Representativeness of 2002 Ozone Season for Ozone Transport Region SIP Modeling, Final Report

Appendix D5: TSD-1b: Processing of Biogenic Emissions for OTC/MANE-VU Modeling

Appendix D6: TSD-1c: Emission Processing for the Revised 2002 OTC Regional and Urban 12 km Base Case Simulations

Appendix D7: Technical Support Document for 2002 MANE-VU SIP Modeling Inventories, Version 3 (zip file)

Appendix D8-1: TSD-1f: Future Year Emissions Inventory for 8-HR OTC Ozone Modeling

Appendix D8-1 Attachments 1-2

Appendix D8-1 Zip File: D8-1

Appendix D8-2: Development of Emission Projections for 2009, 2012, and 2018 for Non-EGU Point, Area, and Nonroad Sources in the MANE-VU Region, Final TSD

Appendix D9: TSD-1j: Emission Processing for OTC 2009 OTW/OTB 12 km CMAQ Simulations

Appendix D10: TSD-1e: CMAQ Model Performance and Assessment 8-HR OTC Ozone Modeling ( Attachments 1-20) (zip file)

Appendix D11: TSD-1g: Relative reduction factor (RRF) and “Modeled Attainment Test”

Appendix D12: Calculation Methodology for Alternate RRFs and DVFs

Proposed Appendix D13: Quantification of Additional Control Measures Not Included in the 2009 BOTW Modeling (and Attachments 1-2) (zip file)

Final Appendix D13: Quantification of Additional Control Measures Not Included in the 2009 BOTW Modeling (and Attachments 1-2) (zip file)

Appendix D14: Unmonitored Area Analysis from the New York Department of Environmental Conservation and the Delaware Department of Natural Resources and Environmental Control

Proposed Appendix E: RFP Projected Inventories

Final Appendix E: RFP Projected Inventories

Attachment 1 (zip file): Point Source Inventory Projections for 2008 and 2009

Attachment 2 (zip file): Attachment 2: Area Source Inventory Projections for 2008 and 2009

Proposed Attachment 3 (zip file): Nonroad Source Inventory Projections for 2008 and 2009

Proposed 3-1 (zip file): Nonroad Model Outputs

Proposed 3-2 (zip file): Aircraft LTO Calculations

Proposed 3-3 (zip file): Locomotive Calculations

Proposed 3-4 (zip file): CMV Calculations

Proposed 3-5 (zip file): VOC Final Nonroad Calculations

Proposed 3-6 (zip file): NOx Final Nonroad Calculations

Final Attachment 3 (zip file): Nonroad Source Inventory Projections for 2008 and 2009

Final 3-1 (zip file): Nonroad Model Outputs

Final 3-2 (zip file): Aircraft LTO Calculations

Final 3-3 (zip file): Locomotive Calculations

Final 3-4 (zip file): CMV Calculations

Final 3-5 (zip file): VOC Final Nonroad Calculations

Final 3-6 (zip file): NOx Final Nonroad Calculations

Proposed Attachment 4: Onroad Source Inventory Projections for 2008 and 2009: Files available upon request

Proposed 4-1: NJTPA Onroad Files Vol 1 of 4_RFP_Conformity Runs

Proposed 4-1: NJTPA Onroad Files Vol 2 of 4_2008 RFP Benefit Runs

Proposed 4-1: NJTPA Onroad Files Vol 3 of 4_2009 RFP Benefit Runs

Proposed 4-1: NJTPA Onroad Files Vol 4 of 4_FMVCP Runs

Proposed 4-2: SJTPO Onroad Files Vol 1 of 3_RFP Conformity Runs

Proposed 4-2: SJTPO Onroad Files Vol 2 of 3_RFP Benefit Runs

Proposed 4-2: SJTPO Onroad Files Vol 3 of 3_FMVCP Runs

Proposed 4-3: DVRPC Onroad Files Conformity and RFP Runs

Proposed 4-4: Read Me_Onroad_RFP Results

Final Attachment 4: Onroad Source Inventory Projections for 2008 and 2009: Files available upon request

Final 4-1: NJTPA Onroad Files Vol 1 of 4_RFP_Conformity Runs

Final 4-1: NJTPA Onroad Files Vol 2 of 4_2008 RFP Benefit Runs

Final 4-1: NJTPA Onroad Files Vol 3 of 4_2009 RFP Benefit Runs

Final 4-1: NJTPA Onroad Files Vol 4 of 4_FMVCP Runs

Final 4-2: SJTPO Onroad Files Vol 1 of 3_RFP Conformity Runs

Final 4-2: SJTPO Onroad Files Vol 2 of 3_RFP Benefit Runs

Final 4-2: SJTPO Onroad Files Vol 3 of 3_FMVCP Runs

Final 4-3: DVRPC Onroad Files Conformity and RFP Runs

Final 4-4: Read Me_Onroad_RFP Results

Appendix F1: New Jersey Department of Transportation Project Analyses (zip file)

Appendix F2: New Jersey RACM Analysis Tables

Appendix F3: New Jersey Department of Transportation 2009 RACM – Political Feasibility

Appendix G: Onroad Fleet Turnover Emission Reductions for 2010 (zip file)

Appendix H: Public Participation (Final Only)

Attachment 1: Notice of Availability

Attachment 2: Documentation of the Notices that Appeared in the Newspapers and the New Jersey Register

Attachment 3: Response to Comment Document