Air Permitting Guidance

The following documents are intended to provide general guidance to the regulated community.

Step 1 – Verification by the applicant: Applicant must review N.J.A.C. 7:27-8.2(c) to check if the equipment or source operation needs an air permit. An air permit is needed if the subject equipment or source operation matches with any of the listed categories and is not exempted pursuant to N.J.A.C. 7:27-8.2(d), (e) or (f).

Step 2 – Verification by the Department: If Step 1 did not address applicant’s specific situation and the applicant has questions regarding permit applicability, an Air Permit Applicability Determination form must be completed and submit it to the Department by email at pcpnotices@njdepwptest.net.

DocumentDate
Applicability of Sanitizing Operations to N.J.A.C. 7:27-16.24, Industrial Cleaning4/9/24
AP-42 Emission Factors for Arsenic (As) and Cadmium (Cd) from Natural Gas Combustion11/20/23
Become a Non-Major Facility1/1/18
Boiler Derating7/15/15
CEM Averaging Periods7/6/16
CEMS for Oxidizers, THC Periodic Monitoring11/21/16
Cold Cleaning Machines5/6/08
Common Control Questionnaire9/19/19
Conveyor System as Piece of Equipment10/18/23
Definition of Startup for Stack Testing Requirements in Permits2/14/24
Dual Fuel Burners10/11/11
Emergency Burning of Fuel Oil12/9/10
Emergency Fire Pumps9/17/17
E85 and N.J.A.C. 7:27-16 Applicability10/2/09
FAQ for Phase I Vapor Recovery Rule Amendments6/26/23
Fumigation Permitting FAQ2/1/23
Minor Air Facilities Fee Schedule1/1/25
Major Air Facilities Fee Schedule1/1/25
Guidelines for Evaluating Proposed Emission Rates12/14/07
Inclusion of Hazardous Air Pollutants (HAPs) in Air Permits8/8/08
Limiting Potential to Emit8/14/18
Minimum Enclosed Combustion Chamber Temperature3/29/11
Non-Catalytic Oxidizer Conditions9/15/87
Operating Permit Renewals - Expiration Dates6/20/22
Periodic Emission Monitoring (PEM) Downtime11/16/22
Permit Applicability for Engine at Minor Facility and Permit Applicability for Engine at Major Facility7/15/24
PM 10 Emissions Testing & Limits10/26/05
Process Monitor Downtime10/8/08
RADIUS Emission Point Inventory Guidance – Atypical Sources10/23/19
Reporting Thresholds3/12/18
SOTA Applicability for Modified Sources6/25/07
Stack Testing Averaging Periods11/2/15
Stack Test Extensions9/24/18
Startup-Shutdown-Malfunction9/18/24
Temporary Equipment Procedure, Temporary Equipment Flow Chart, CRM Flow Chart5/7/18
Transfer of Ownership and Name Change at a Title V Facility7/7/15
Use of Odor Neutralizers at Landfills11/22/22
Questions or Comments?