
Basic Industrial Stormwater Permit (5G2)
This general permit is available to regulated industrial facilities that have eliminated or can eliminate within six months of authorization, all exposure of industrial materials or activities to stormwater discharges (rainfall and snowmelt waters). Exposure may be eliminated by covering the materials or activities or by moving materials or activities indoors.