Highway Agency MS4 Stormwater Permit
The Highway Agency Stormwater General Permit authorizes the discharge of stormwater from highways or other thoroughfares operated by counties or by entities such as the NJ Department of Transportation, NJ Turnpike Authority, and the South Jersey Transportation Authority.
- *NEW 11/27/2024*- Final Renewal Highway Agency Stormwater Master General Permit (effective 01/01/2025)
- Draft Renewal Highway Agency Stormwater Master General Permit (issued 8/23/2024)
- Final Renewal Highway Agency Stormwater Master General Permit (issued November 29, 2019 with response to comments)
- Draft Renewal Highway Agency Stormwater Master General Permit (issued August 21, 2019 with fact sheet)
- Example Ordinances
- Attachment D – Major Development Project List
- Outfall Inspection Form
- Illicit Connection Inspection Report Form
- Stream Scouring Investigation Recordkeeping Form
- New Development Checklist
- Post Construction Program Design Checklist for Individual Projects
- Underground Vehicle Wash Water Storage Tank Pump Out Log
- Underground Vehicle Wash Water Storage Tank Use Log
Stormwater Pollution Prevention Plan
- SPPP Full Manual – Stormwater Pollution Prevention Plan
- SPPP Form 1 – Team Members
- SPPP Form 2 – Revision History
- SPPP Form 3 – Public Involvement
- SPPP Form 4 – Public Education and Outreach
- SPPP Form 5 – Post-Construction Stormwater Management in New Development
- SPPP Form 6 – Regulatory Mechanisms
- SPPP Form 7 – Litter Pick-Up Program
- SPPP Form 8 – Street Sweeping
- SPPP Form 9 – Herbicide Application and Roadside Vegetative Waste Management
- SPPP Form 10 – Maintenance Yards and Other Ancillary Operations
- SPPP Form 11 – Storm Drain Inlets
- SPPP Form 12- Catch Basins
- SPPP Form 13 – Employee Training
- SPPP Form 14 – Mapping Outfall Pipes and Stormwater Facilities
- SPPP Form 15 – Outfall Pipe Inspections
- SPPP Form 16 – Stormwater Facilities Inspection and Maintenance
- SPPP Form 17 – Total Maximum Daily Load (TMDL) Information
- SPPP Form 18 – Additional Measures and Optional Measures
- SPPP Form 19 – Shared or Contracted Services