
Construction Activities (5G3)
This general permit authorizes point source discharges from certain construction activities. Regulated entities are required to develop a soil erosion and sediment control plan aimed at eliminating the flow of contaminated rainwater into streams and rivers. On October 1, 2009, DEP launched the Stormwater Construction E-Permitting System. With the implementation of this system, the State Soil Conservation District offices no longer accept Stormwater Construction General Permit Request for Authorization (RFA) forms. All RFAs shall be submitted electronically using the NJDEP Online portal to access this electronic application service. Below are links to access the E-Permitting system as well as guidance materials to aid in the process.
DEP Online E-Reporting User Video Instruction – These three videos are designed to guide you with step-by-step instruction through the DEP Online E-Permitting process.
These three videos are designed to guide you with step-by-step instructions through the NJDEP Online E-Permitting process.
Part 1: Registration with myNewJersey and NJDEP Online Business Portal.
Part 2: NJDEP Construction Activity Stormwater General Permit Online E-permitting Request for Authorization Tutorial.
Part 3: NJDEP Construction Activity Stormwater General Permit Online E-Permitting GeoWeb Tutorial.